Fill the canal with Sealer and the masterpoints are inserted.
Dip accessory points into the Accelerator.
Passively harpoon the coated accessory points alongside the masterpoints.
After 5 minutes, prepare the post space.
STEP – 2
Mailyard Fiber post drill prepares the post space.
Trial fit the Fiber posts and determine the desired length.
After etching and rinsing the canal and super-structure, place the adhesive on the moist tooth.
Placement of the dual purpose resin cement and core build-up material.
Final preparations. Note that the posts were placed over the centric cusps.